Garnet Energy Center, LLC is seeking authority from the New York State Board on Electric Generation Siting and the Environment (the Siting Board) to construct a 200-megawatt (MW) solar photovoltaic electric generating facility with a 20 MW/4-hour duration energy storage system (the Project) in the Town of Conquest, Cayuga County, New York, pursuant to Article 10 of the New York State Public Service Law (PSL).
Pursuant to PSL § 163 and Section 1000.5 of the Siting Board’s rules (16 NYCRR § 1000.5), Garnet submitted twelve paper copies of its Preliminary Scoping Statement (“PSS”) to the Siting Board. An electronic copy of the PSS can also be found at the link below.
Figure 01_Regional Project Location.pdf
Figure 02_Project Area and Study Area.pdf
Figure 03_Existing Land Use.pdf
Figure 04_Vegetative Cover.pdf
Figure 05_Agricultural Districts.pdf
Figure 06_Flood Zones.pdf
Figure 07_Slopes.pdf
Figure 08_Soils.pdf
Figure 09_Seismic Hazard.pdf
Figure 10_Groundwater Aquifers.pdf
Figure 11_Water Wells.pdf
Figure 12_Mapped Streams and Wetlands.pdf
Figure 13_Visual Study Area.pdf
Figure 14_Tax Assessment Jurisdiction.pdf